Works in Public · a tool for commissioners · 2026
The brief
The first thing every client asks is the price. We wanted an answer that was true, short and showed which costs they control.
What we did
Broke a mural's cost into ten elements. Five sit in the wall: size, condition, access, land and permits, visibility. Five sit in the process: the brief, design style, who signs off, level of engagement, and lead-in time.
Wrote one plain line for each. A lift is generally cheaper than scaffold. One decision-maker is quick; a panel or a public vote brings rework. A long lead-in buys permits, better artists and dry weather.
Drew them on a grid of cost against control. The site side you budget for. The client side is where decisions save money.
Put both pages in our capability deck.
What a client gets
A way to see, before asking for a quote, that lead-in time, engagement and sign-off are the three levers that move the number.