London Borough of Hackney and Network Rail · Hackney Central arches, E8 · 2026
By Tom Jackson
The brief
Printed artwork panels on tunnel walls beneath a working railway. The wall takes vibration when trains pass, panels will need replacing one day, and the asset owner wants to know exactly what is being fixed to its structure.
What we did
Compared three fixing systems for aluminium composite panels: stand-off mounts, a channel rail, and a full aluminium frame.
Chose the channel rail. It copes with vibration, hides the fixings, and lets one panel be swapped without touching the rest. Stand-offs need many fixing points and are less forgiving of movement. A full frame is the most robust and the most expensive.
Specified 3 mm Alupanel Eco: 3.39 kg per square metre, matt white printable face, fire class D-s2,d0, with the test report cited for the fire submission.
Specified anti-vibration washers and corrosion-resistant fixings.
Set it all out as a technical briefing for the community licence application.
Who was involved
London Borough of Hackney. Network Rail (asset owner). Works in Public (specification and installation).
What the client gets
A fixing method the asset owner can approve, written before anyone orders a panel. We used the same panel material in the brick reveals at Alperton Bridge.